Muscle Shoals Wastewater Improvements

Location: 

2212 E 2nd St, Muscle Shoals, AL 35661

Owner: 

Muscle Shoals Utility Board

Engineer/Design Firm:

Completed:

4/1/2021

Existing Wastewater plant addition of new aeration basin, effluent structure & pump station-new blower building & new fine bubble aeration equipment (Sanitare).

WE’RE PROUD OF WHAT WE DO!
For that reason, you will find that there are no stock images on this website. All images featured on BHCraigConst.com are locally photographed.
© 2023 BH Craig Construction
Website designed by
ACEEATON DESIGNS & PRODUCTION
© 2021 BH Craig Construction
Website designed by
ACEEATON DESIGNS & PRODUCTION
linkedin facebook pinterest youtube rss twitter instagram facebook-blank rss-blank linkedin-blank pinterest youtube twitter instagram